Back to Home Page

TM-9-1410-250-12/1

DEPARTMENT OF THE ARMY TECHNICAL MANUAL

OPERATOR AND ORG MAINTENANCE MANUAL:

INTERCEPT-AERIAL
GUIDED MISSILE MIM-14A AND MIM-14B

(NIKE-HERCULES AND IMPROVED NIKE-HERCULES AIR DEFENSE GUIDED MISSILE SYSTEMS)

November 1967

Presentation notes:


Cover & Table of Contents
Paragraphs Pages
PART ONE. ASSEMBLY AND SERVICE OPERATIONS
CHAPTER 1. INTRODUCTION
1-1-1-11 1-1-1- 2
CHAPTER 2. PARTS, TOOLS, AND EQUIPMENT
Section I. Parts, common tools, and equipment
2~1-2-3 2-1
II. Special tools and equipment and fabricated tools
2-4-2-5 2-1-2-3
CHAPTER 3. ASSEMBLY OF THE MISSILE FOR ELECTRICAL CHECKOUT
Section I. General
3-1-3-3.1 3-1--3-$
II. Inspection of containers
3-4, 3-5 3-8
III. Uncrating and assembling the missile
3-6-3-14 3-8-8-33
CHAPTER 4. AIR AND OIL SERVICING AND MISSILE ELECTRICAL CHECKOUT
Section I. Air and oil servicing the accessory power supply (APS)
4-,1-4-7 4-1-4-8
II. Air and oil servicing the hydraulic pumping unit (HPU)
4-8-4-11 4-25,4-26
III. Missile electrical checkout
4-12-4-16 4-43-4-73
IV. Fuel servicing and operational test (hot-run) of the accessory power supply (APS)
4-17--4-19 4-74-4-80
CHAPTER 5. UNCRATING AND INSTALLING THE MISSILE ROCKET MOTOR ASSEMBLY
Section I. Preliminary procedures
1 5-1-5-4.1
II. Uncrating the missile rocket motor subassembly
5-7,5-8 5--6-5-7
III. Installation of the missile rocket motor subassembly
5-9, 5-10 5-12-5-14
CHAPTER 6. UNCRATING AND INSTALLING THE WARHEAD BODY
SECTION
6--1-6-3 6-1-6-4
CHAPTER 7. FINAL PREPARATION OF THE WARHEAD BODY SECTION AND THE FORWARD BODY SECTION
Section I. Electrical cable connections
7-1-711 7-1-7-3
II. Installation of the forward main fin and the forward body section __
7-5-7-10 7-7-7-16
III. Installation of the rear roll ring
7-11,7-12 7-17-7-18
CHAPTER 8. ASSEMBLY OF THE ROCKET MOTOR ASSEMBLY 8-1$9 8-1-8-22
CHAPTER 9. JOINING PROCEDURES FOR THE MISSILE BODY AND ROCKET MOTOR CLUSTER
Section 1. Transporting the missile body and the rocket motor cluster to the launching area
9-1,9-2 9-1-9-4
II. Joining the missile body and the rocket motor cluster on the launching-handling rail
9-4--9-8 9-8-9-16
CHAPTER 10. FINAL PREPARATION OF THE MISSILE 10-1-10-6 10-1-10-17
PART TWO. DEACTIVATION, CORRECTIVE MAINTENANCE, AND STORAGE
CHAPTER 11. NORMAL DEACTIVATION PROCEDURES
Section 1. General
11-1-11-3 11-1
11. Preliminary procedures
11-4---11-7 11-1-11-4
III. Removal of the missile from the launching area, using guided missile low-bed trailer M529
11-8,11-9 11-5
IV. Removal of the missile body from the launching-handling rail
11-10-11-11 11-6-1.1-7
V. Removal of the rocket motor cluster from the launching- handling rail
11-12,11-13 11-8
VI. Removal of the forward body section
11-14,11-15 11-9
VII. Removal of the forward main fins and preparation for removal of the warhead body section
11-16-11-19 11-10, 11-11
VIII. Removal of the warhead body section
11-20-11-22 11-11,11-12
IX. Removal of the missile rocket motor subassembly
11-23-11-26 11-13-11-15
X. Defueling, depressurizing, and purging the .accessory power supply (APS)
11-27-11-31 11-16-11-18
XI. Removing and packaging the main fins and the elevons
11-32--11-34 11-20
XII. Preparation of the forward and rear body sections for shipment or storage
11-35-11-37 11-21,11-22
CHAPTER 12. CORRECTIVE MAINTENANCE
Section I. General
12-1-12-3 12-1-12--6
II. Corrective maintenance of the missile guidance set (MUSHROOM)
12-4-12-21 12-7-12-25
Ill. Corrective maintenance of the missile guidance set (STOVEPIPE)
12-21.1-12-46 12-25-12-45
IV. Corrective maintenance of the forward body section
12-47-12-55 12-45-12-50
V. Corrective maintenance of the warhead body section
12-56-12-60 12-51-12-54
VI. Corrective maintenance of the missile motor section
12-61-12-64 12-55,12-56
VII. Corrective maintenance of the equipment section
12-65--12-68 12-56-12-58
VIII. Corrective maintenance of the accessory power supply (APS) and the hydraulic pumping unit (HPU)
12-69--12-73 12-59-12-69
IX. Accessory power supply (APS) servicing system cleanup- launching area
12-74-12-79 12-70-12-76
X. Hydraulic pumping unit (HPU) servicing and system cleanup-launching area
12-80-12-84 12-81-12-84
XI. Corrective maintenance of the actuator section
12-85--,12-87 12-86,12-87
XII. Corrective maintenance of main fins and elevons
12-88-12-90 12-90,12-91
XIII Corrective maintenance of the shipping and storage containers
12-91-12-99 12-91-12-96
XIV. Corrective maintenance of the rocket motor cluster
12-100-12-117 12-96-12-103
CHAPTER 13. WINTERIZATION INSTRUCTIONS
Section I. General
13-1-13-4 13-1-13-3
II. Rocket motor cluster winterization kit
13-5-13-20 13-6-13-22
III. APS and battery box winterization kit
13-21-13-24 13-22-13-25
IV. Corrective maintenance of winterization kits
13-25-13-27 13-26-13-27
CHAPTER 14. NIKE-HERCULES GUIDED MISSILE TRAINING BODY SECTION M84
Section I. General
14-1,14-2 14-1
II. Physical description
14-3-14-8 14-1-14-3
III. Shipment, inspection, and uncrating
14-9-14-15 14-8-14-14
IV. Assembly procedures
14-16-14-26 14-14-14-16
V. Disassembly procedures
14-27-14-37 14-16,14-17
VI. Corrective maintenance
14-38-14-41 14-18
CHAPTER 15. HANDLING, SHIPMENT, AND LIMITED STORAGE
Section I. General
15-1-15-4 15-1,15-2
II. Shipment
16-5-15-7 15-2-15-5
III. Limited storage
15-8-15-18 15-7-15-12
IV. torque requirements
15-19-15-21 15-14
APPENDIX A. BASIC ISSUE ITEMS LIST A-1-A-5 A-1-A-8
INDEX 1